I had my sisterlocks installed over a long weekend 28 - 29th July 2007. It took roughly 18-20hrsours with breaks.
My consultant: Carol Lawrence: http://www.tassahai.co.uk/
This picture was taken on 30th July and I love them!
I had my sisterlocks installed over a long weekend 28 - 29th July 2007. It took roughly 18-20hrsours with breaks.
My consultant: Carol Lawrence: http://www.tassahai.co.uk/
This picture was taken on 30th July and I love them!